East Main Street Waterline Replacement Project Update and Two-Week Look Ahead
July 20, 2017
Improvements to the City's waterline infrastructure will continue along the East Main Street corridor. Additional information regarding this project can be found at: http://durhamnc.gov/3001/East-Main-Street-Waterline-Replacement.
Planned Road / Lane Closures will occur as follows:
* Week of 7/24:
* Lane shifts and flaggers on East Main Street between Church Street and Fayetteville Street, Hood Street, and South Elizabeth Street.
* Lane closures on Ramseur Street between Dillard Street and Fayetteville Street.
* Lane closure on East Main Street between Church and Roxboro streets during weekend work.
* Week of 7/31:
* Lane shifts and flaggers on East Main Street between Roxboro Street and Fayetteville Street, Hood Street, and South Elizabeth Street.
* Lane closures on Ramseur Street between Dillard Street and Fayetteville Street.
Saturday-Sunday July 22-23, 2017:
* No work is planned for Saturday, July 22nd or Sunday, July 23rd.
Week of July 24, 2017:
* Restoration of sidewalks, curb, etc. and abandonment of existing waterlines in East Main Street between Roxboro and Fayetteville streets, Hood Street, South Elizabeth Street, and Ramseur Street will continue.
* Lane shifts and flaggers will be used to maintain traffic at isolated locations in the project area.
* Through traffic on East Main Street will be maintained.
* Noise levels in excess of the current City noise ordinance are anticipated during work hours.
* Pedestrian and driveway access to buildings / facilities will be maintained at all times.
* Stormwater installation will begin on East Main Street between S. Elizabeth / Commerce and Hood streets.
* Lane closures and detours will be used to maintain traffic at stormwater crossing locations on East Main Street.
* Through traffic on East Main Street will be maintained.
* Noise levels in excess of the current City noise ordinance are anticipated during work hours.
* Pedestrian and driveway access to buildings / facilities will be maintained at all times.
* Stormwater installation along Ramseur Street between Dillard and Hood streets will continue.
* Lane closures and detours will be used to maintain traffic at stormwater crossing locations at Hood and S. Elizabeth streets.
* Noise levels in excess of the current City noise ordinance are anticipated during work hours.
* Pedestrian and driveway access to buildings / facilities will be maintained at all times.
* Existing stamped concrete in East Main Street on the west side of Roxboro Street will be removed.
* Lane closures and shifts will be used to maintain traffic in both directions during work.
* Noise levels in excess of the current City noise ordinance are anticipated during work hours.
* Pedestrian and driveway access to buildings / facilities will be maintained at all times.
Friday - Monday July 28-31, 2017:
* Stamped concrete restoration will take place on East Main Street on the west side of Roxboro Street.
* East Main Street will be closed between Church Street and Roxboro Street from 7 PM on Friday through 6 AM on Monday.
* Traffic control signs and markings will be used for East Main Street detours.
* Noise levels in excess of the current City noise ordinance are anticipated on Friday evening and Saturday morning.
* Pedestrian and driveway access to buildings / facilities will be maintained at all times.
Week of July 31, 2017:
* Restoration of sidewalks, curb, etc. and abandonment of existing waterlines in East Main Street between Roxboro and Fayetteville streets, Hood Street, South Elizabeth Street, and Ramseur Street will continue.
* Lane shifts and flaggers will be used to maintain traffic at isolated locations in the project area.
* Through traffic on East Main Street will be maintained.
* Noise levels in excess of the current City noise ordinance are anticipated during work hours.
* Pedestrian and driveway access to buildings / facilities will be maintained at all times.
* Stormwater installation will continue on East Main Street between Elizabeth and Hood streets.
* Lane closures and detours will be used to maintain traffic at stormwater crossing locations on East Main Street.
* Through traffic on East Main Street will be maintained.
* Noise levels in excess of the current City noise ordinance are anticipated during work hours.
* Pedestrian and driveway access to buildings / facilities will be maintained at all times.
* Stormwater installation along Ramseur Street between Dillard and Hood streets will continue.
* Lane closures and detours will be used to maintain traffic at stormwater crossing locations at Hood and S. Elizabeth streets.
* Noise levels in excess of the current City noise ordinance are anticipated during work hours.
* Pedestrian and driveway access to buildings / facilities will be maintained at all times.
Saturday-Sunday August 5-6, 2017:
* No work is planned for Saturday, August 5th or Sunday, August 6th.
Future Weeks:
* Restoration of sidewalks and other surfaces impacted by the project will continue.
* Waterline service reconnections in Angier Avenue between East Main Street and Elm Avenue will coordinated with affected residents. A lane closure on Angier Avenue will be required to complete the work.
* Stormwater improvements along East Main Street will continue.
* Pavement improvements in the intersection of Fayetteville / East Main street are anticipated to occur in late August. An intersection closure with traffic detours is planned for approximately 4-5 days to complete the work.
* Work will exceed the current City noise ordinance.
* Additional information regarding this work can be found at www.DurhamOperationGreenlight.org<http://www.DurhamOperationGreenlight.org>. Find more information about all of the department's current projects at www.DurhamWaterProjects.org<http://www.DurhamWaterProjects.org>. If you have questions, please email DowntownLoopWRP at DurhamNC.gov<mailto:DowntownLoopWRP at DurhamNC.gov>.
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.deltaforce.net/pipermail/inc-list/attachments/20170720/97b5e725/attachment.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image001.jpg
Type: image/jpeg
Size: 2734 bytes
Desc: image001.jpg
URL: <http://lists.deltaforce.net/pipermail/inc-list/attachments/20170720/97b5e725/attachment.jpg>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image002.png
Type: image/png
Size: 23964 bytes
Desc: image002.png
URL: <http://lists.deltaforce.net/pipermail/inc-list/attachments/20170720/97b5e725/attachment.png>
More information about the INC-list
mailing list